Chevrolet Spark 2017
LTZ
All-inclusive price to the port in Italy
€6,750
By Ro-Ro (Livorno / Salerno / Bari)
35–40 days from departure (estimated)
By Container (Genoa / La Spezia / Naples)
70–80 days from departure (estimated)
Ro-Ro or Container: same price, only the timing changes.
All-inclusive, turnkey: the car, transport from Korea, inspection, paperwork and documents, unloading and the customs agency at the port. There are no other costs from us.
Customs not included: import duties and import VAT are paid by the buyer.
On arrival at the port
Unloading and customs agency are already in the price; customs (import duties and VAT) is paid by the buyer
Port pickup
- Unloading (Ro-Ro / Container)
- included
- Customs agency
- included
Home delivery (optional)
- Car transporter, port → your door
- 150–400 €
- Example: Bari → Milan
- ≈ 350 €
Included in the price
- ✓ Full inspection of the car in Korea
- ✓ Purchase and Korean local costs
- ✓ Sea transport to the Italian port, Ro-Ro or Container
- ✓ Unloading and customs agency at the port
- ✓ Complete translated documents
- ✓ Customs paperwork (duties and VAT excluded)
- ✓ Warranty on engine, gearbox and chassis
Key equipment
- Year
- 2017
- Mileage
- 12,456 km
- Fuel
- Petrol
- Gearbox
- Automatic
- Colour
- White
- Engine size
- 999 cc
- Seats
- 5
+39 380 635 8654
Or leave your contacts
We'll get back to you on WhatsApp, usually within a few hours.
Vehicle history
Official data from the Korean insurance registry (KIDI) and the statutory inspection. Register data saved on 2026-09-04.
Insurance repair details
- 2023-03-03repair cost: ≈ €1,395
- 2023-03-03repair cost: ≈ €539
Technical inspection
Live from EncarKorean statutory inspection sheet and Encar diagnosis, read straight from Encar while you look at this page.
Certified mileage
12.440 km
First registration
2017-04-25
Chassis (VIN)
KLYDC487DHC816507
Bodywork: work found
- Front fender (left)Replacedouter panel
- Front door (left)Replacedouter panel
- Rear door (left)Sheet metal workouter panel
An outer panel is swapped without touching the structure. Work on the load-bearing structure is another matter: always ask us for photos before deciding.
Mechanical test
All mechanical groups check out.
Sheet issued on 2026-08-24

