Genesis G90 2019
3.8
All-inclusive price to the port in Italy
€19,400
By Ro-Ro (Livorno / Salerno / Bari)
35–40 days from departure (estimated)
By Container (Genoa / La Spezia / Naples)
70–80 days from departure (estimated)
Ro-Ro or Container: same price, only the timing changes.
All-inclusive, turnkey: the car, transport from Korea, inspection, paperwork and documents, unloading and the customs agency at the port. There are no other costs from us.
Customs not included: import duties and import VAT are paid by the buyer.
On arrival at the port
Unloading and customs agency are already in the price; customs (import duties and VAT) is paid by the buyer
Port pickup
- Unloading (Ro-Ro / Container)
- included
- Customs agency
- included
Home delivery (optional)
- Car transporter, port → your door
- 150–400 €
- Example: Bari → Milan
- ≈ 350 €
Included in the price
- ✓ Full inspection of the car in Korea
- ✓ Purchase and Korean local costs
- ✓ Sea transport to the Italian port, Ro-Ro or Container
- ✓ Unloading and customs agency at the port
- ✓ Complete translated documents
- ✓ Customs paperwork (duties and VAT excluded)
- ✓ Warranty on engine, gearbox and chassis
Key equipment
- Year
- 2019
- Mileage
- 124,453 km
- Fuel
- Petrol
- Gearbox
- Automatic
- Colour
- Black
- Engine size
- 3778 cc
- Seats
- 5
+39 380 635 8654
Or leave your contacts
We'll get back to you on WhatsApp, usually within a few hours.
Vehicle history
Official data from the Korean insurance registry (KIDI) and the statutory inspection. Register data saved on 2026-09-11.
Insurance repair details
- 2022-07-20repair cost: ≈ €472
- 2021-06-30repair cost: ≈ €1,195
- 2020-07-31repair cost: ≈ €674
Technical inspection
Live from EncarKorean statutory inspection sheet and Encar diagnosis, read straight from Encar while you look at this page.
Certified mileage
124.431 km
First registration
2019-07-10
Chassis (VIN)
KMHG141DBKU072297
Previous use
Rental car
Bodywork: work found
- Front fender (right)Replacedouter panel
An outer panel is swapped without touching the structure. Work on the load-bearing structure is another matter: always ask us for photos before deciding.
Mechanical test
All mechanical groups check out.
Sheet issued on 2025-11-20